The Disability Discrimination Act 1992 makes it unlawful to refuse or limit access to premises the public may enter because of disability. A person, or since December 2022 a representative body, can complain to the Australian Human Rights Commission. Most complaints go to conciliation; unresolved complaints can go to the Federal Court or the Federal Circuit and Family Court. For a building owner, manager or builder, the best evidence is an independent access audit, interim measures that work on the day, and a dated action plan. Sydney Access Consultants provides technical access advice and expert evidence, not legal advice. Call (02) 9586 3111.
What the DDA actually requires of buildings
Section 23: access to premises
Section 23 covers premises the public, or a section of the public, is entitled or allowed to enter or use. It is unlawful to refuse a person access because of disability, to set less favourable terms or conditions of access, to refuse the use of facilities in the premises, or to provide unsuitable means of access. Steps at the only entry, a toilet nobody using a wheelchair can enter, blocked accessible parking and entry conditions applied unfairly can all raise section 23.
Section 24: goods, services and facilities
A shop, clinic, club or council service can be caught under section 24 even where the building itself is not the main issue, because the complaint is about how the service is provided to a person with disability.
Where the Premises Standards fit
The Disability (Access to Premises, Buildings) Standards 2010 apply to new building work, and to the affected part, when a building approval is sought. Under section 34 of the Act, doing something in accordance with a disability standard is not unlawful, so work that complies with the Premises Standards is protected for what those Standards cover. Existing, untouched parts of a building are not made compliant by an old occupation certificate. They still sit under the general duty. See our NCC Part D4 access guide and change of use and fit-out access for how new work and the affected part are defined, and DDA compliance versus the NCC.
Unjustifiable hardship
Where an adjustment would impose unjustifiable hardship, that can be a defence. It is assessed on the facts and the evidence, not assumed. See unjustifiable hardship in NSW.
How a DDA complaint runs, step by step
- Complaint lodged with the Australian Human Rights Commission. Since the December 2022 amendments, the Commission President may terminate a complaint lodged more than 24 months after the conduct complained about (Australian Human Rights Commission Act 1986, section 46PH). That is a discretion, not an automatic bar. Representative bodies can also lodge on behalf of people aggrieved and can take a terminated complaint to court.
- Inquiry and conciliation. The Commission inquires and usually tries conciliation. In access matters, typical outcomes are an agreed works program, interim measures (an alternative accessible entry with signage, a staff procedure, a safe portable solution), an apology and sometimes compensation.
- Termination if not resolved. If conciliation fails, the complaint is terminated. The complainant then has 60 days from the termination notice to apply to the Federal Court or the Federal Circuit and Family Court, or longer if the court allows (section 46PO).
- Court hearing. At hearing, expert evidence on access becomes central: what the barrier is, what the relevant Standards say, and what adjustment is reasonable. See expert witness access consulting.
Interim injunctions while the complaint is open
Section 46PP allows a court, once a complaint has been lodged with the Commission, to grant an interim injunction to keep things as they were before the complaint was lodged. That matters for live projects, as the first case below shows.
Two 2025 Federal Court decisions and what they teach owners and builders
Interim injunction over a footpath during roadworks
In Seniors and Disabilities Best Access Group v Commissioner of Main Roads [2025] FCA 424, an access group complained that roadworks and footpath changes in Western Australia would make crossing unsafe. The court refused to stop roundabout works that were already substantially complete, but granted a 28-day interim injunction stopping removal of an existing footpath so the Commission process could run. The injunction was later discharged on the balance of convenience in a follow-up decision, [2025] FCA 615.
The lessons: a complaint can pause part of a live project; the earlier the stage of work, the more of the existing position a court can protect; and the court weighed public safety and the practical cost of holding a site open.
Shopping centre bans and the causal link
In Reurich v Savills (SA) Pty Ltd [2025] FCA 420, a person with an assistance animal was banned from a regional NSW shopping centre by a security guard acting for the property manager. The claims were dismissed because the court found the bans were for breaching a no-filming condition of entry, not because of disability or the assistance animal.
The lessons for centre managers: conditions of entry, and how staff and contractors apply them, sit within section 23; consistent, documented rules applied to everyone matter; and assistance animals have specific protection under the Act.
Received a complaint? What to do in the first two weeks
- If works are under way, do not alter or remove the feature complained about until you have advice. See the footpath case above.
- Get the scope of the complaint in writing and identify which parts of the premises and which facilities are involved.
- Commission an independent access audit of those parts against the Premises Standards, NCC Part D4 and AS 1428.1. The audit separates genuine barriers from items that already comply. See existing building access audits.
- Put interim measures in place that work on the day: an alternative accessible entry with clear signage, a staff procedure, or a portable solution where it is safe.
- Prepare a dated, prioritised action plan with realistic timing. See DDA Action Plan for building owners and how to write a DDA Action Plan.
- Where a full upgrade is not reasonable, have the reasons assessed and documented. See unjustifiable hardship, and Performance Solutions where an NCC pathway exists.
- Bring your lawyer in early. An access consultant provides the technical evidence; the legal strategy is your lawyer's.
Preventing complaints in the first place
Existing buildings
Audit, then plan, then review on a cycle. An owner who can show a current audit and a plan being worked through is in a far better position at conciliation than one starting from nothing. See a practical guide to DDA complaints prevention.
Live projects
Review access at design. Check before any existing path, ramp, kerb ramp or entry is removed or diverted. Keep a temporary accessible route open during construction where the public still uses the site. Book a final access inspection before the occupation certificate; see occupation certificate access inspections.
Management practice
Entry conditions, assistance animals, staff training, and keeping accessible features clear. Accessible toilets used as storerooms and blocked accessible parking are common, avoidable triggers.
Where Sydney Access Consultants helps
Sydney Access Consultants are Accredited Access Consultants: Gary Finn is an Accredited Member of the Access Consultants Association, member 435. We prepare independent access audits, Premises Standards assessments, Performance Solutions, and expert reports prepared to the standard the courts expect of expert evidence. Sydney Access Consultants has been engaged after a DDA complaint about access to and within an older Class 2 apartment building.
Our practice concentrates on Cronulla, the Sutherland Shire and Hurstville, and covers greater Sydney and NSW. See Sutherland Shire access reports.
Answer-ready questions
Can a building owner be taken to court under the DDA for poor access?
Yes. The Disability Discrimination Act makes it unlawful to refuse access to premises the public may enter, or to set unfavourable terms or means of access, because of disability. A complaint goes first to the Australian Human Rights Commission. If it is not resolved and is terminated, the complainant can apply to the Federal Court or the Federal Circuit and Family Court within 60 days of the termination notice.
Does an occupation certificate protect my building from a DDA complaint?
Not on its own. Work done in accordance with the Premises Standards is protected for what those Standards cover, but parts of an existing building that were never upgraded remain subject to the general duty. An independent access audit shows where you stand.
How long does someone have to lodge a DDA complaint?
The Commission may terminate a complaint lodged more than 24 months after the conduct complained about. That is a discretion, not an automatic bar.
Can a DDA complaint stop building work?
It can. From the time a complaint is lodged, a court can grant an interim injunction to keep things as they were. In Seniors and Disabilities Best Access Group v Commissioner of Main Roads [2025] FCA 424, the Federal Court temporarily stopped removal of an existing footpath during roadworks while the complaint was considered, although it did not stop works that were already substantially complete.
What should I do first if I receive a complaint?
Do not remove or alter the feature in question while advice is pending, get an independent access audit of the affected areas, put practical interim measures in place, and prepare a dated action plan. Involve your lawyer early; an access consultant provides the technical evidence.
Who can lodge a complaint?
The person affected or, since December 2022, a representative body acting for people aggrieved, which can also take a terminated complaint to court.
For an audit, a Premises Standards assessment or an expert report, call Sydney Access Consultants on (02) 9586 3111 for a fee. The free initial consultation is a plan review only.