A planner holds Secretary's Environmental Assessment Requirements that include accessibility and an EIS deadline. The access report maps each relevant SEAR, reviews the concept against NCC Parts D4, E3 and F4, the Premises Standards and AS 1428, and sets out what will be re-checked at Construction Certificate stage. NSW building work is assessed under NCC 2022 Amendment 2 until NCC 2025 is adopted in NSW on 1 May 2027. Sydney Access Consultants authors the report and Performance Solutions; we are not the consent authority and not the certifier.

When does an SSD need an access report?

The report is driven by the SEARs. An access report is needed where the issued SEARs raise accessibility, often under built form, design quality or accessibility headings. It is not automatic for every SSD.

Industry-specific versus project-specific SEARs

If a project is wholly permissible on the site, would not be designated development if it were not SSD, and is not a concept development application, it is eligible for industry-specific SEARs, and no scoping report is required with the SEARs request. The Department issues those SEARs within seven days. All other SSD projects need a scoping report and receive project-specific SEARs. Source: Department of Planning, Housing and Infrastructure, State significant development guidelines – preparing a scoping report (October 2022), sections 1.3–1.4.

Typical project types

Seniors housing with residential aged care, schools, hospitals, university buildings and large mixed-use developments. See the related sector pages for seniors housing SEPP accessibility, hospital access reports NSW, university campus access reports NSW and aged care access reports.

What SEARs usually ask for on accessibility

Common patterns include demonstrating equitable and dignified access, compliance with the NCC, the Disability (Access to Premises — Buildings) Standards 2010 and AS 1428, and access across the site and to the public domain. Check the actual SEARs issued for the project on the Major Projects portal rather than relying on a generic paraphrase.

The SEARs reporting table

A useful SSDA access report opens with a table that lists each relevant SEAR item, the section of the report that addresses it, and a short summary of the response. This helps the Department and agencies see that every requirement has been answered. Where useful, the table also points to where each item is picked up in the EIS. The EIS itself must include its own SEARs table that points to the specialist reports.

What an SSDA access report includes

Concept-stage review against NCC Parts D4 (access), E3 (lifts) and F4 (sanitary facilities), plus the Premises Standards and the AS 1428 series. Site-wide and public domain access covers entries, continuous accessible paths of travel between buildings, car parking, drop-off and landscape grades. Items that cannot be fully resolved at concept stage are flagged for design development and CC stage. Where a Performance Solution is likely (heritage fabric, steep sites, existing buildings retained), the report identifies the Performance Requirements and the proposed assessment method. See performance solutions and heritage access performance solutions.

What else the access consultant lodges with the EIS

Compliance tables

These are a separate, reusable deliverable: NCC access provisions, adaptable housing (AS 4299, where it is in the brief) and Livable Housing, each status-coded against the drawings. See adaptable housing and Livable Housing. What applies is established for each project, rather than assuming a development control plan percentage for an SSD. Items that cannot be closed out at concept stage are marked for design development and Construction Certificate, using capable-of-compliance language where that is all the drawings support.

The SEARs declaration or statement

A signed statement by the qualified author of the access report, identifying the author, their professional qualifications, the documents relied on, and that the report addresses the relevant SEARs. It covers the access appendix only. It is not the Registered Environmental Assessment Practitioner declaration for the EIS as a whole under the Environmental Planning and Assessment Regulation 2021, section 190(3).

Appendix-ready files

Accessible, tagged PDFs with a navigable heading structure, consistent with the Department's EIS accessibility requirements (WCAG 2.0 Level AA, tagged PDFs, alt text, contrast). Source: EIS guideline, section 2.6.

How the access package sits in the EIS

The State significant development guidelines – preparing an environmental impact statement (Appendix B to the SSD guidelines, March 2026) split the EIS into a main report and appendices. The appendices should include a SEARs table (showing where each SEAR is addressed in the EIS, including in the specialist assessment reports), a statutory compliance table, and any supporting technical reports. The main report must accurately summarise the specialist reports and stay consistent with them on the project description. Those appendices form part of the EIS under the Environmental Planning and Assessment Regulation 2021, section 192(4). The access report is one of the specialist assessment reports. The planner, not the access consultant, compiles the EIS. Our job is to provide a report, tables and statement that can be appended and summarised without being rewritten. The guidelines are published on planning.nsw.gov.au.

Who declares what

Under the Environmental Planning and Assessment Regulation 2021, section 190(3), and EIS guideline section 2.7, a Registered Environmental Assessment Practitioner must declare the EIS before it is submitted: that it has been prepared in accordance with the Regulation, contains all available relevant information, is not false or misleading, and includes the matters required by the Registered Environmental Assessment Practitioner Guidelines (including that the EIS addresses the SEARs). A signed copy of that declaration is included as a page of the EIS. The access consultant's SEARs declaration or statement is a different document. It lets the Registered Environmental Assessment Practitioner and the Department see who wrote that appendix and that the relevant SEARs have been addressed in that specialist report. Sydney Access Consultants does not make the section 190(3) declaration. Author qualifications on our access reports include Accredited Member #435 of the Access Consultants Association.

SSD access report versus council DA access report

An SSD report is assessed by the Department of Planning, Housing and Infrastructure (or the Independent Planning Commission) against the SEARs. It is publicly exhibited with the EIS and must answer agency submissions. A council DA report responds to DCP controls and a council request. The SSD report should be written so it can be updated for the Construction Certificate rather than rewritten. Department guidelines also require EIS and modification documents to be accessible PDFs. See DA vs CC access report.

SSD, DA, CC and the Design Compliance Declaration compared

SSD / EIS access packageCouncil DA access reportCC-stage access reportDesign Compliance Declaration (Class 2)
Who relies on itDepartment (or the Independent Planning Commission), agencies, the public, the EIS authorCouncil planners and the design teamThe registered certifier / PCA and the builderThe design practitioner's declaration under the Design and Building Practitioners Act 2020
What drives itThe issued SEARs, the SSD guidelines and the EISTypically a council request and DCP or local overlayThe consent conditions and the construction documentsThe DBP Act and the declared regulated design
FormSEARs table, specialist report, compliance tables, author statement, appendix-ready PDFCapability assessment on the planning setElemental status on the named CC documentsA declaration, not an access report. The report can support the declarant; it does not replace the Design Compliance Declaration
Public exhibitionYes, with the EISUsually not exhibited as an EISNoNo

Development control plans and SSD

Many SSD access reports note that development control plans do not apply to State Significant Development under State Environmental Planning Policy (Planning Systems) 2021. Even where a development control plan does not apply, the SEARs, the NCC, the Premises Standards, and any applicable housing SEPP or design guide still do. Adaptable or Livable Housing tables are not irrelevant to an apartment SSD.

Design Compliance Declaration

On Class 2 work the Design Compliance Declaration under the Design and Building Practitioners Act 2020 is a separate declaration by the design practitioner. The access report can support it; it does not replace it. See design compliance declaration access NSW.

From SSD consent to Construction Certificate

Conditions of consent commonly require access compliance to be demonstrated at CC. The SSD report should be structured so it can be updated. Response to submissions is handled by answering agency or community submissions on accessibility with the same clause-by-clause approach.

When to engage an access consultant on an SSD

At scoping or SEARs request stage, before the concept design is fixed. Early review avoids redesign after exhibition and lets any Performance Solution be flagged in the EIS rather than discovered at CC.

Our current SSD work

Sydney Access Consultants has prepared the access report, compliance tables and SEARs declaration for a current State Significant Development mixed-use residential project in Sydney. A Performance Solution was flagged in that package at concept stage, so it can be developed before Construction Certificate rather than discovered there.

How Sydney Access Consultants helps on major projects

SEARs review, SSDA access report, design-team workshops, RFI and submissions responses, CC-stage report and Performance Solutions. Call (02) 9586 3111. The free initial consultation covers a review of floor plans only. A site inspection is chargeable.

FAQs

Do I need an access report for a State Significant Development in NSW?
Usually, when the Secretary's Environmental Assessment Requirements raise accessibility. The access report responds to each relevant SEAR and shows how the concept design can meet NCC Parts D4, E3 and F4, the Disability (Access to Premises — Buildings) Standards 2010 and the AS 1428 series, and what will be resolved at Construction Certificate stage.

How is an SSD access report different from a council DA access report?
An SSD report is assessed by the NSW Department of Planning, Housing and Infrastructure against the SEARs, is publicly exhibited with the EIS and must answer agency submissions. It should open with a table mapping each SEAR to its response, and be written so it can be updated for the Construction Certificate rather than rewritten.

When should an access consultant be engaged on an SSD?
At scoping or SEARs request stage, before the concept design is fixed. Early review avoids redesign after exhibition and lets any Performance Solution be flagged in the EIS rather than discovered at CC.

Who makes the statutory EIS declaration?
A Registered Environmental Assessment Practitioner, under section 190(3) of the Environmental Planning and Assessment Regulation 2021. The access consultant's statement covers the access appendix only.